Skip to main content
Native macOS · Local transcription · Privacy-first

Every meeting becomes a record you can trust.

Vemoir records from your menu bar, transcribes on your Mac, and turns each call into minutes, decisions, actions and follow-ups — kept local by default, with optional export or sharing when you choose.

Local by default

Audio is deleted after processing by default; the transcript and record stay on your Mac until you export them.

Menu-bar capture

Start recording from the menu bar without changing tools or interrupting the call.

Summarized locally

Transcripts are processed into summaries, decisions and follow-ups on your Mac.

Structured output

A complete record with decisions, actions, owners and a follow-up draft.

The Mac workflow

Record, follow along, ask

Vemoir keeps the full app visible while you work: projects, meetings, live recordings, manual notes and summarized outputs all stay in one native Mac workspace.

01

Tap record

Vemoir captures mic and system audio from the menu bar, with a live recording indicator.

02

Transcribed

Speech becomes a timestamped local transcript while the meeting continues.

03

Processed

Vemoir separates speakers, decisions, actions and follow-up context on this Mac.

04

Summarized

The summary stays local, with optional export or external sharing when needed.

Capture and models

Record live calls, import audio and choose the AI stack.

Use the default local setup, pick advanced on-device models, or connect a cloud provider with your own API key when a specific workflow needs it.

Upload formats

Bring in the recording you already have.

Upload meeting audio after the fact and Vemoir will turn it into a transcript, minutes, decisions and follow-up actions.

MP3M4AWAVAIFFCAFFLAC
Vemoir live transcription view with waveform, speaker transcript and manual notes

Model library

Local models download only when you ask.

Audio, transcripts and prompts remain on this Mac during inference. Provider models such as OpenAI GPT stay opt-in through your own key.

Transcription

Fast local speech-to-text, including multilingual and automatic-language options.

Parakeet TDT 0.6B v3Parakeet TDT 0.6B v2Whisper SmallWhisper Large v3
Speaker separation

Anonymous speaker turns and optional speaker profiles stay on device until you rename or export them.

FluidAudioSpeaker Profiles
Meeting notes

Local structured summaries, or optional provider models with your own API key.

GPT-OSS 20BQwen3 4B

Upload existing audio

Drop in recordings after the call and turn them into searchable transcripts and structured notes.

On-device models

Work with local models such as Qwen when privacy, latency or offline use matters.

Bring your API key

Use provider models such as OpenAI GPT with your own key when you want cloud reasoning.

Your notes included

Add notes during the meeting and Vemoir folds them into the AI-enhanced version.

Meeting context

Make every record understand the room.

Speaker profiles, project glossaries and local cleanup help Vemoir recognize who said what and preserve the terms your team uses.

Speaker profiles

Optionally identify the same people across meetings with local voice profiles that never leave your Mac.

Project glossaries

Add project terms, names and acronyms so summaries use the language your team expects.

Microphone noise isolation

Clean up mic input locally before transcription so voices stay clearer in busy rooms.

Chat with Vemoir

Ask the record what happened, then turn it into work.

Chat across the transcript, manual notes, decisions and project context. Vemoir answers from the meeting record and can draft artifacts without exposing raw audio.

Chat with Vemoir Processed on this Mac
You

What changed for the Friday launch?

Vemoir

Friday remains the decoder integration target. Marco owns the export checklist, and privacy wording needs approval before external sharing.

Languages

Use Vemoir in your working language.

Run the app in the languages your team already uses, and select a transcription model with the coverage your meeting needs.

Application languages

Localized for everyday Mac workflows.

Vemoir's interface is available in the core languages most teams need day to day.

EnglishGermanItalianFrenchDutch
25 Transcription languages

Transcription language coverage

Language support follows the model you choose.

Parakeet v3 supports 25 European languages. Coverage for every other transcription model follows that model.

25 European languages with Parakeet v3 Coverage adapts to the selected model Automatic language options where supported Local and provider models available

Live notes to final record

Your notes, transcript and AI output stay together.

Add your own notes during the meeting. When the recording stops, Vemoir folds them into the AI-enhanced summary, decisions, action items and searchable transcript.

Vemoir meeting summary view with manual notes, summary, decisions and next steps
Capture settings

System audio, mic and model selection stay explicit.

Vemoir shows exactly which inputs and transcription model are active before a call starts.

Meeting record

Manual notes become part of the final record.

The summarized record carries your own notes, decisions, actions and transcript context together.

Supported platforms

Works anywhere your Mac can hear the meeting.

Vemoir captures mic and system audio, so transcription is not locked to one calendar, bot or meeting provider.

Microsoft Teams

Calls, standups and customer meetings.

Slack Huddles

Quick syncs without changing tools.

Zoom

Webinars, interviews and recurring reviews.

Google Meet

Browser-based calls captured from your Mac.

Discord

Community, support and voice-channel notes.

Any audio app

Anything that plays audio on your machine.

Use cases

Built for every meeting where the outcome matters.

Use Vemoir whenever the conversation creates decisions, tasks, research signal or customer context that should not disappear after the call ends.

Team syncs

Keep minutes, blockers, decisions and owners together after recurring calls.

Sales calls

Capture objections, next steps, follow-up language and account context.

Product reviews

Turn feedback loops into decisions, open questions and release actions.

Hiring interviews

Preserve candidate notes, scorecard evidence and debrief action items.

Customer research

Extract themes, quotes, pain points and project-level insights.

Leadership updates

Share crisp summaries without forwarding raw recordings around the company.

Export and share

Meeting notes stay local, then travel when you choose.

After Vemoir summarizes the record, keep it on your Mac or share the useful layer through native macOS actions: minutes, decisions, action items and project notes.

Shareable outputs

Meeting minutes ready for email or docs
Action items owners, dates and next steps
Decisions cleanly separated from discussion
Project notes roll up across meetings
Generated artifacts emails, updates and follow-ups

FAQ

Answers before the first recording.

Can I upload existing audio files?

Yes. Vemoir can transcribe imported MP3, M4A, WAV, AIFF, CAF and FLAC files, so old calls can become structured records too.

Which meeting apps does Vemoir work with?

Vemoir records mic and system audio on your Mac, so it works with Teams, Slack, Zoom, Google Meet, Discord and any other app that plays audio on your machine.

Meeting notes without a bot

Can I use local or cloud AI models?

Yes. You can work with on-device models such as Qwen, or bring an API key for provider models such as OpenAI GPT.

Which languages does Vemoir support?

The app interface supports English, German, Italian, French and Dutch. Parakeet v3 supports 25 European languages; other coverage depends on the transcription model you select.

Can I add my own notes during a meeting?

Yes. Your manual notes are treated as first-class context and included when Vemoir creates the AI-enhanced minutes, decisions and action items.

What can I export or share?

You can export and share meeting minutes, decisions, action items, generated artifacts, follow-up drafts and project-level notes after Vemoir summarizes the recording.

Does everything have to leave my Mac?

No. Vemoir is local by default. After processing, audio is deleted unless you choose to keep it. Transcripts and generated records stay on your Mac unless you explicitly export or choose a cloud model. You can also transcribe a file you already have in the browser — nothing is uploaded.

Best AI notetaker without a bot

Open the browser tools

Can I transcribe a file without the Mac app?

Yes. The free in-browser tools turn a recording you already have into text on this device. Live capture and stronger models stay in Vemoir for Mac.

Open the browser tools

How is Vemoir different from Otter or Granola?

Vemoir, Granola and MacWhisper capture audio on the device. Otter and Fireflies use a meeting bot. Vemoir transcribes on the Mac by default and is a one-time purchase, with no tiers and no seat count.

Compare Vemoir with other AI note takers

All questions

Why teams keep it

One place for what was decided and what's next.

Stop re-listening to calls and re-typing notes. The recap is ready before you've closed the laptop.

5

interface languages: English, German, French, Italian and Dutch.

25

European transcription languages with Parakeet v3.

0

cloud uploads required for local transcription.

4

outputs: minutes, decisions, actions and follow-up draft.

Using a summarized meeting record on a Mac
Use the record, not the recording. Minutes, decisions, actions and a follow-up draft — ready the moment the call ends.

Pricing

One price. No subscription.

Pay once and keep using Vemoir. No monthly fee, no charge per meeting, no seat count.

$22.99 one-time

Launch price for the first 200 buyers.

  • Every feature included — there are no tiers
  • Local transcription, so no cloud upload is required
  • Optional provider models with your own API key
  • Apple silicon, macOS 14.2 or later
Vemoir

Keep the record. Keep it private.

Apple silicon native. Your meeting data stays on your Mac unless you choose to export or share it.

Download on the App Store
Mac system requirements Apple silicon only · macOS Sonoma 14.2+

Minimum requirements

  • Mac with Apple silicon — M1 or newer
  • macOS Sonoma 14.2 or later
  • 8 GB unified memory*
  • 10 GB of available storage
  • Internet connection for initial setup and model downloads
  • Microphone and System Audio Recording permissions

Recommended

  • 16 GB or more unified memory
  • 20 GB or more available storage if you plan to retain recordings or install additional AI models
  • The latest available version of macOS

8 GB Macs are supported with Vemoir's lightweight local models. For faster processing, longer meetings, and running Vemoir alongside video-conferencing apps, 16 GB or more is recommended.

Vemoir asks only for System Audio Recording and Microphone, not Screen Recording, and never receives your screen contents. Once your selected models are installed, the complete meeting workflow can run offline.

Intel-based Macs are not supported.
macOS 14.2+ · Apple silicon

Customize your cookie preferences. Essential cookies cannot be disabled as they are required for the website to function properly.

Essential Cookies

Required for basic website functionality, security, and the free in-browser tools limit (timestamps of successful runs in the current week, no content).

Always active

Analytics Cookies

Help us understand how visitors interact with our website to improve user experience. Includes Google Analytics and Microsoft Clarity session recordings.

Marketing Cookies

Used to track visitors across websites to display relevant and engaging advertisements.